emailrtcme@rtcme.comcall971 2 645 2662

National Rehabilitation Centre in Abu Dhabi was launched on May 2002 as a leading centre in addiction prevention, treatment and rehabilitation services and now they are expanding their current location to a 200 bed premises catering to both males and females. The project consists of three phases, The first phase consist of one building containing 8 wings of which are connected together by open/closed corridors . The construction of Phase 2 will include VIP villas & long rehabilitation villas and Phase 3 will include the construction of a training & research center & 100 inpatient male building .NRC ‘s mission is to provide the best available treatment of drug addiction disorders and extend specialized rehabilitation services to UAE nationals.

Project Description

The capacity for the facility in phase 1 is for 175 inpatients, the average number of outpatients to attend over and above the inpatients will be 30, with a further 30 patients on a day care basis.

The project consists of male inpatient/outpatient program, administration, women’s inpatient / outpatient program, training & conference center, mosque, recreation areas (indoor gym , outdoor play ground and healing gardens), ancillary & security.Residential areas for inpatients are located in the inpatient buildings for Male & female buildings and the VIP villas with private access.

The services are :

  • Inpatient services
  • Overdose
  • Intensive care for the treatment of cases of addiction or addiction – induced poisoning.
  • Ordinary inpatient services
  • Outpatient clinic
  • Outreach services
Project Location

The National Rehabilitation Centre is located in Al Mafraq area Abu Dhabi , United Arab Emirates.

Client

National Rehabilitation Centre

Role of CRTC Consultancy

CRTC Consultancy has been appointed by Bayaty Architects for the Civil Design Component of the proposed National Rehabilitation Centre in Al Mafraq.

Scope of Works

As a Sub- Consultant CRTC has carried out the following tasks:

  • Liaising with Authorities
  • Internal roads and site access detailed design
  • Circulation and auto turn plans
  • Car parking detailed design
  • Storm water design
  • Street lighting design
  • Signing and marking plans
Gross Floor Area

66,685 Sq.m

Actual Value

AED 650 Million

Project Completion

March 2013

- CRTC CLIENTS -