emailrtcme@rtcme.comcall971 2 645 2662

City Season’s Hotel is a 530 five star hotel with all facilities and highest standards, located in the middle of Abu Dhabi emirate with classical style. The proposed development is a luxury CBD hotel consists of 495 rooms together with their needed common facilities. The hotel consists of an underground level that includes an intermediate floor and three basements, and an upper ground level that includes the ground floor, the mezzanine, eighteen floors and the roof. It is expected that the proposed development will be fully operational in 2011. The project will be constructed in one phase.

Client

Sheikh Musallam Salem Bin Ham Al Amry (Bin Ham Group)

Project Description

It will have two large meeting rooms and exclusive banqueting area for corporate meetings, events and celebrations. Other facilities include an excellent dining restaurant, health club, spacious lobby and comfortable rooms.

Project

Traffic Impact Study of City Seasons Hotel Abu Dhabi, United Arab Emirates.

Project Location

The proposed development is located within the Central Business District (CBD) of Abu Dhabi. The project site is bounded by Zayed the First Street from the east and the 3rd Street from the west.

Role of RTC Consultants

RTC Consultants have been commissioned by James Cubitt Architects to carry out a Traffic Impact Study (TIS) for the proposed City Seasons Hotel in Abu Dhabi, UAE. The purpose of this report is to document the methodology that will be utilized in preparing the Traffic Impact Study for the project including the identification of the proposed study area limits, traffic growth assumptions, the projected development trip generation and parking requirements, the transportation assumptions, the traffic counts locations and durations, etc.

Scope of Services
  • Liaising with Abu Dhabi Municipality and Abu Dhabi Traffic Police
  • Traffic Counts
  • Methodology Report
  • Micro Modeling, Trip Distribution, Assignment and Mode Split
  • Traffic Impact Analysis
  • Parking Requirements
  • Site Access and Circulation
  • Traffic Impact Study Report
  • Addressing Comments
Project Value

AED 30 Million

Completion Date

December 2011
For more information please contact
Mona Nasr, mnasr@rtcme.com

- CRTC CLIENTS -